Indonesia
The Central Java Ultra-Critical Power Plant is a new coal fired power plant located in Indonesia. The power plant, which will have a capacity of 2,000 MW, is designed to supply power to the population of Java Island.
Portland Bolt was selected to provide F1554-G55 anchor rod assemblies which were hot-dip galvanized. The anchor rods were part of an assembly which also included welded plate washers, pipe sleeves, and coupling nuts.
This project was on a tight deadline, and after completing the manufacturing, Portland Bolt packaged the assemblies in custom export crates and shipped the order via air freight to Jakarta, Indonesia.
Portland Bolt’s ability to manufacture custom anchor rod assemblies quickly, and more importantly correctly, makes us an excellent option for projects with critical deadlines. Portland Bolt has shipped close to 500 orders outside of the United States in 2017, and we’ve shipped to 31 different countries. Our knowledge of international packaging and shipping requirements help to make Portland Bolt an extremely reliable option for projects overseas.